The Sea Nation
  • Home
  • Ikaroa
  • Sailing
  • Tech
  • Journal
  • About
  • Join
Sign in Subscribe
Tech

Testing Starlink Before It Lands on Ikaroa

I’m testing internet from Mars before it later lands on our boat.

Monika Matis

17 Oct 2021 • 1 min read
Share
Testing Starlink Before It Lands on Ikaroa
← Previously Dry-Fitting Ikaroa’s Hull Side
The Ikaroa Story How it started
Next → A Paint Scheme for Ikaroa

Ok, we are testing internet from Mars which later will land on our boat 🙂

#TIKI38 #IKAROA #THESEANATION #BUILDINGAWHARRAM #allelectricboat #Starlink
Adam Beret MańczukMonika MatisThe Sea Nation

The Second Roof Is Curing

The Second Roof Is Curing

The second roof took a day and a half, and it’s curing nicely. I’m hoping the mould came loose on the first roof, because this one may have flattened slightly where the fittings bent under the stress.
19 Aug 2026 1 min read
The Second Roof Goes Much Faster

The Second Roof Goes Much Faster

I spent four days checking, measuring and moulding the first roof; the second is already epoxied together and fitting nicely. A little trimming remains, plus one suspiciously unsupported lifting operation.
14 Aug 2026 2 min read
Getting the Bow Cabin Roof Up

Getting the Bow Cabin Roof Up

I need to get this lovely, bloody heavy bow cabin roof three metres up—once it stops impersonating a copper hedgehog. Adam, come back to the workshop.
13 Aug 2026 1 min read
The Sea Nation © 2026
  • Get the newsletter
  • Support us
  • Merch
Powered by Ghost