The Sea Nation
  • Home
  • Ikaroa
  • Sailing
  • Tech
  • Journal
  • About
  • Join
Sign in Subscribe
Ikaroa

Reorganising the Boatyard for More Plans

I finally need more than one sheet of plans at a time now that I’m working in 3D. Clearly, the boatyard had to be reorganised.

Monika Matis

01 Jun 2021
Share
Reorganising the Boatyard for More Plans
← Previously Long Battens for Ikaroa’s Stringers
The Ikaroa Story How it started
Next → After Months of Work, the Hulls Sit Straight

Absolutely necessary reorganisation of our boatyard. Well, we finally need more than one sheet of plans at the time as we work 3D now!

The Second Roof Is Curing

The Second Roof Is Curing

The second roof took a day and a half, and it’s curing nicely. I’m hoping the mould came loose on the first roof, because this one may have flattened slightly where the fittings bent under the stress.
19 Aug 2026 1 min read
The Second Roof Goes Much Faster

The Second Roof Goes Much Faster

I spent four days checking, measuring and moulding the first roof; the second is already epoxied together and fitting nicely. A little trimming remains, plus one suspiciously unsupported lifting operation.
14 Aug 2026 2 min read
Getting the Bow Cabin Roof Up

Getting the Bow Cabin Roof Up

I need to get this lovely, bloody heavy bow cabin roof three metres up—once it stops impersonating a copper hedgehog. Adam, come back to the workshop.
13 Aug 2026 1 min read
The Sea Nation © 2026
  • Get the newsletter
  • Support us
  • Merch
Powered by Ghost