Fillets, Bunks and Cabin Layout Games
The fillets over the floors turned out better than expected, but the resin finally ran out. I glued on the last bunk supports and played with the toilet, shower drainage and holding-tank layout before splitting the starboard moving floor in two.
As expected - fillets over the floors turned out to be much better :)
But I have to stop that for now and switch to cutting plywood again, as the resin (also as expected!) finally run out. Not before I have glued last of the bunk/shelf supports on the bulkheads so I can prepare the main cabin bunks.
I have also played a bit checking out different things like space in the toilet, location of a holding tank or drainage for the shower… that was definitely a lot of fun, but I also realised I have to divide the moving floor part in starboard hull into two separate sections- one inside the shower and the other in the cabin… this games are rather useful!
#allelectricboat #buildingwharram #theseanation #tiki38 #fillets





